LCA

LCA

Environmental profile in a life cycle perspective
It takes more than twice as much energy to fabricate a bridge made of conventional materials than one made of GRP composite. That was the conclusion of an environmental assessment carried out by authorities in the Netherlands in connection with a specific bridge project.

 
 

 

Download ”Study of Rijkswaterstaat, NL, 2003, by Ryszard A Daniels”

Share