Fast installation in mountainous area
Bridges
Bridge built of two sections for pedestrians and skiers
The bridge consists of two sections of each 12.5 m, one section is glued, one is bolted. Fiberline is currently measuring the two sections to achieve knowledge and prove the performance of the two assembly methods.
Low weight and easy handling made quick installation possible in the mountainous area. For the same reason the bridge is easily disassambled in spring to avoid damming and flooding when the melting water carries stone and gravel through the riverbed
Dimensioner:
- Total length: 25 m
- Weight: 3300 kg
- Load capacity: 500 kg/m
- Max. allowed deflection: L/800
Advantages
- Low weight/high strength
- Easy handling and quick installation
- Weather resistance/no maintenance
- Dimensions and design according to customer requirements